亚洲激情图片,大鸡巴操B视频免费看,成人网站三级中文字幕在线,国产视频粗硬大

歡迎您進(jìn)入山東蘭天篷膜安裝工程有限公司 在線留言 聯(lián)系我們

服務(wù)咨詢熱線

15064156568

熱門關(guān)鍵詞: 移動推拉篷 鋼化玻璃和鋼結(jié)構(gòu) 固定停車篷

公司新聞

首頁>>新聞資訊>>公司新聞
聯(lián)系我們
山東蘭天篷膜安裝工程有限公司

聯(lián)系人:張經(jīng)理

電話:15064156568

網(wǎng)址:http://www.xzzokh.cn

地址:山東省濟(jì)南市市中區(qū)建設(shè)路99-5號一層?xùn)|戶

停車棚在建設(shè)以及施工時要注意的事項

來源:http://www.xzzokh.cn/ 日期:2023-04-03 發(fā)布人:
隨著社會經(jīng)濟(jì)的迅速發(fā)展,膜結(jié)構(gòu)的停車棚的使用也越來越多,透光性是現(xiàn)代膜結(jié)構(gòu)停車棚被廣泛認(rèn)可的特性之一。膜材的透光性可以為建筑提供所需的照度,這對于建筑十分重要?,F(xiàn)在我們就來了解下濟(jì)南停車棚在建設(shè)以及施工時要注意的事項。
With the rapid development of social economy, the use of membrane structure parking sheds is also increasing. Light transmittance is one of the widely recognized characteristics of modern membrane structure parking sheds. The light transmittance of membrane materials can provide the required illumination for buildings, which is very important for building energy conservation. Now let's learn about the construction and precautions for parking sheds in Jinan.
A、加工準(zhǔn)備及下料:依據(jù)施工圖放樣,放樣和號料時要預(yù)留焊接收縮量和加工余量,依據(jù)放樣作樣板。
A. Processing preparation and blanking: Set out according to the construction drawing, reserve welding shrinkage and machining allowance during setting out and marking, and use the setting out as a template.
B、預(yù)埋件安裝處理:定位預(yù)埋件安裝位置,打鉆安裝。要求預(yù)埋件位置準(zhǔn)確、埋設(shè)牢固。標(biāo)高偏差不大于9mm,左右位移不大于20mm。
B. Installation treatment of embedded parts: locate the installation position of embedded parts, and drill for installation. The embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
C、測量放線:依據(jù)土建標(biāo)高基準(zhǔn)線測預(yù)埋件標(biāo)高線,檢查預(yù)埋件標(biāo)高偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔的調(diào)整處理方案。
C. Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation reference line, and check the elevation deviation and left and right deviation of embedded parts. Organize the results and determine the adjustment and treatment plan for the separation of embedded parts.
D、懸掛臂安裝焊接:懸掛臂安裝采用焊接,需檢查焊接節(jié),調(diào)節(jié)懸掛臂設(shè)計坡度,準(zhǔn)確無誤方能進(jìn)行焊接??窟呉粭l懸掛臂準(zhǔn)確無誤后,安裝另一邊一條懸掛臂,就位準(zhǔn)確后點焊。
D. Suspension arm installation and welding: The suspension arm installation adopts welding, and it is necessary to check the welding joints, adjust the design slope of the suspension arm, and conduct welding only if it is accurate and correct. After the suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is correctly positioned.
濟(jì)南停車棚
停車棚在施工時的步驟:
Steps for construction of parking sheds:
一,加工準(zhǔn)備及下料:依據(jù)施工圖放樣,放樣和號料時要預(yù)留焊接收縮量和加工余量,依據(jù)放樣作樣板。
1、 Processing preparation and blanking: Set out according to the construction drawing, reserve welding shrinkage and machining allowance during setting out and blanking, and use the setting out as a template.
二,預(yù)埋件安裝處理:定位預(yù)埋件安裝位置,打鉆安裝。要求預(yù)埋件位置準(zhǔn)確、埋設(shè)牢固。標(biāo)高偏差不大于9mm,左右位移不大于20mm。
2、 Installation and processing of embedded parts: locate the installation position of the embedded parts and drill for installation. The embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
三,測量放線:依據(jù)土建標(biāo)高基準(zhǔn)線測預(yù)埋件標(biāo)高線,檢查預(yù)埋件標(biāo)高偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔的調(diào)整處理方案。
3、 Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation reference line, and check the elevation deviation and left and right deviation of embedded parts. Organize the results and determine the adjustment and treatment plan for the separation of embedded parts.
四,懸掛臂安裝焊接:懸掛臂安裝采用焊接,需檢查焊接節(jié),調(diào)節(jié)懸掛臂設(shè)計坡度,準(zhǔn)確無誤方能進(jìn)行焊接??窟呉粭l懸掛臂準(zhǔn)確無誤后,安裝另一邊一條懸掛臂,就位準(zhǔn)確后點焊。
4、 Suspension arm installation and welding: Suspension arm installation adopts welding. It is necessary to inspect the welding joints, adjust the design slope of the suspension arm, and conduct welding only if it is accurate and correct. After the suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is correctly positioned.
通過以上小編的詳細(xì)介紹,我們對以上的信息有所了解,希望以上有您需要的信息,需要幫助的可以及時聯(lián)系我們。更多事項就來咨詢我們http://www.xzzokh.cn吧!
Through the detailed introduction by the above editor, we have gained some understanding of the above information. We hope that you have the information you need above. If you need help, please feel free to contact us in a timely manner. For more information, please consult us http://www.xzzokh.cn Come on!

閱讀/ Recommended reading

  在濟(jì)南地區(qū)安裝遮陽棚,需根據(jù)棚體類型、安裝環(huán)境及施工難度選擇適配工具。無論是家用陽臺遮陽棚還是商用伸縮棚,工具配置需兼顧性、精準(zhǔn)度與作業(yè)效率,確保施工過程符合建筑規(guī)范與...

濟(jì)南可移動式推拉棚可以幫助生活中有什么優(yōu)勢? 2025-06-03
濟(jì)南遮陽棚日常清洗怎么簡單有效? 2025-05-27
濟(jì)南雨棚優(yōu)選:膜結(jié)構(gòu)車棚的六大核心優(yōu)勢 2025-05-16
面對極端天氣要怎么處理遮陽棚防止被破壞? 2025-05-14

魯公網(wǎng)安備 37010302000864號

91精品国产99久久久久久| 乱子伦视频在线看| 亚洲中文久久精品无码浏不卡| 精品国产免费久久久| 五十路亲子中出在线观看| 亚洲AV日韩AV无码AV| 小蜜桃1| 色综合天天综合网国产成人网| 色哟哟国产| 九九热精品视频在线观看| 国产精品揄拍100视频| 久久久久久久久久电影| free性丰满白嫩白嫩的hd| ass日韩年轻美女pics| 欧美粗大| 蜜桃视频网址| 国色天香桃花朵朵开| 小泽玛利亚一区二区在线观看| 久久婷婷五月综合色国产香蕉| 国产强被迫伦姧在线观看无码| 欧美性受XXXX狂喷水| 2020精品国产福利在线观看香蕉| 性久久久久久| 中文字幕无码视频手机免费看 | 亚洲欧美成人精品香蕉网| 中文字幕日韩精品亚洲七区 | 资兴市| 窝窝午夜精品一区二区| 亚洲日韩国产二区无码| 国产女人高潮抽搐喷水视频| 国产99视频精品免费观看9| 沐川县| 又粗又黄又猛又爽大片免费| 成全免费视频在线播放| 国产精品制服一区二区| 久久精品国产亚洲AV果冻传媒| 日本久久久久久久久精品| 成人欧美一区二区三区在线| 俺来也俺也啪www色| 国产麻豆精品久久一二三| 疯狂放荡的少妇4p|